Free sealed-document templates, sized for a P.Eng or OAA seal.

Word templates matching Ontario conventions for the sealed narrative documents an engineering firm produces. Structural FRR is live and downloadable now. The rest release in three tiers below - what is live today, what Fermito can build as a firm-specific template pack in 2-4 weeks, and what is next on the roadmap.

Axonometric illustration of a drafting table with four blank engineering report templates fanned out, a triangular engineering scale ruler, and a pencil laid across them

Samples

Request a complete sample.

A Fermito person sends a finished sample directly so it lands clean in Word, alongside a short reply on the firm's actual category mix. Replies come back inside one business day.

  • Sample SRR

    A complete site review report drafted by Fermito for a fictional Toronto garage repair project. Anonymized; no real customer data.

  • Sample shoring letter

    A complete shoring acceptance letter for a fictional rear-addition demolition. Reviewed methodology, PE-required additions, and limitations of review.

Available now

Live today.

Downloadable Word templates Fermito generates end-to-end. More disciplines land as each passes the same review pass.

  • Structural FRR

    Available

    The workhorse template. Site visit under OBC 1.2.2.2, observations + photos + recommendations, revision history section, signature block sized for a P.Eng seal.

    OBC 1.2.2.2 - PEO Reg 941

    Download .docx

Ready on request

Your firm's specific template, in 2-4 weeks.

Fermito's voice, photo, and narrative primitives already handle these sealed documents. Request a template pack - we build it to match your firm's house format and generate from day one.

  • Non-Conformance Report

    Ready on request

    Field-deficiency write-up for structural work that departs from the permitted design. Same photo + observation + narrative shape as the FRR; built for the PEO standard-of-care review file.

    PEO standard of care - firm QA

  • Punch List / Deficiency Enumeration

    Ready on request

    Enumerated deficiencies with photos, grouped by location. Structural-signed take-over list matching CCDC 2 General Conditions 5.4.

    CCDC 2 GC 5.4 - structural

  • Condo Act s.44 Performance Audit

    Ready on request

    Mandatory first-year performance audit for every new Ontario condo corporation. Element-by-element narrative + photos, sealed by the reviewing P.Eng.

    Condo Act s.44 - O. Reg. 48/01

    Read the primer
  • Tarion Warranty Report

    Ready on request

    Structural warranty site visit and narrative for Tarion claims under O. Reg. 165/08. Same skeleton as the FRR; sealed output routed into the warranty file.

    Tarion - O. Reg. 165/08

  • Balcony Guard Inspection

    Ready on request

    Per-balcony enumeration with photos on the Toronto 3-year cycle under Municipal Code Ch. 629. High-repetition output; same revision chain as the FRR.

    Toronto Municipal Code Ch. 629

  • Architectural Deficiency / Punch List

    Ready on request

    Take-over deficiency list prepared by the architect of record. Photo-heavy, enumerated by location, signed at take-over under CCDC 2 GC 5.4.

    CCDC 2 GC 5.4 - architectural

  • Warranty Review Report (11-month / 1-year)

    Ready on request

    End-of-warranty review for new builds - architect or P.Eng walkthrough with observations, photos, and a recommended repair list for the builder or Tarion file.

    Tarion - CCDC 2 GC 12

  • Post-Occupancy Evaluation

    Ready on request

    Narrative-led POE for institutional clients or LEED O+M. Walkthrough observations plus a lightweight occupant-survey sidecar, signed by the architect of record.

    OAA practice - LEED O+M

  • Mechanical Commissioning Report

    Ready on request

    Cx narrative bundling functional-performance tests, system-level observations, and photos. Sealed by the commissioning authority or mechanical engineer of record.

    CSA Z5000 - LEED v4 Cx

  • Fire Alarm Verification Report

    Ready on request

    CAN/ULC-S537 verification output - test matrix plus narrative, sealed by the verification engineer. Mandatory for every new commercial fire alarm system in Ontario.

    CAN/ULC-S537

  • Emergency Power System Report

    Ready on request

    Annual emergency-generator load test and report under CSA C282. Narrative plus test observations, sealed by the electrical engineer.

    CSA C282

  • Load Review Letter

    Ready on request

    1-3 page sealed response to proposed load changes: RTU supports, MRI delivery, chillers, safes, snow loads, vehicle access. PE's assessment of existing structure against the new demand, with assumptions and limitations.

    OBC Part 4 - PEO practice advisory

    Read the primer See it drafted
  • Shoring Requirement Letter

    Ready on request

    Sealed contractor-facing letter confirming shoring scope for demolition or renovation work. Names the existing structure, the proposed methodology, and the PE's acceptance criteria.

    OBC Part 4 - site-specific

    Read the primer See it drafted
  • Coring Review Letter

    Ready on request

    Sealed letter with tabular location-by-location judgments on coring through a slab. Handles the hole-by-hole acceptability review that GCs request before cutting.

    OBC Part 4 - PEO practice advisory

    Read the primer See it drafted

On the roadmap

Next directions.

Committed expansions we are building next. Join the waitlist for any of these and we will update you as each lands.

  • More short-form sealed letters

    On the roadmap

    Feasibility opinions for wall removal and structural modifications, hydro vault reviews (O. Reg. 22/04), preliminary and detailed existing-building assessments. Same sealed-letter shape as the three ready-on-request letters; releases in order of demand.

    Cross-doc - sealed letter

  • Architectural General Review

    On the roadmap

    Opportunistic, not an active Fermito product push. Built on the same FRR workflow when an architectural firm asks; Fermito does not self-initiate OAA-signed templates until a customer pulls it.

    OBC 1.2.2.2 - OAA Practice Tip PT.37

  • Reserve Fund Study

    On the roadmap

    Deferred to 2027 unless a specific RFS-heavy firm signs up. Full Condo Act s.94 RFS needs a component-inventory data model, 30-year cashflow engine, and multi-file deliverable; it is real work, not a template swap, and sits behind the daily-habit doc types.

    Condo Act s.94 - deferred to 2027

  • Building Condition Assessment

    On the roadmap

    CSA S478 condition assessment with element-by-element rating and capital-reserve projection. Shares the component-inventory primitive with the RFS build.

    CSA S478 - CMHC BCA Standard

Get notified

First in line when each template drops.

One email per release. Structural is live now. Other disciplines follow once each passes the same review pass.

Required unless marked optional

One email per release. No cross-promotion, no re-selling.

Every template ships as a Word (.docx) file, styled for a P.Eng or OAA seal, with placeholder sections matching the structure Fermito produces out of the box. Use them as-is or fork them into a firm-specific house format.

For firms already running Fermito, your house template is tuned once during onboarding and every report comes out in that format - no manual reformatting.